Flégère Lift Information

Opening planned from 27/06 until 6/09/2009, because of renovation of the Flégère cablecar.

Period 1st departure Last departure for return Last departure for one way Last return from the top Last return from the intermediate level Frequency
27/06 –
06/09/2009
7.45 am Les Praz-Index
4.00 pm
Les Praz-Index
4.30 pm
5.30 pm 5.50 pm Cable car every 15 min. Index continuous